Overview:
The flow blocker assembly is installed at the bottom of the toolhead, used to switch the position of the flow blocker plate and simultaneously control the elevation of the right auxiliary hotend.
In the Box:
- Flow Blocker Assembly *1
- BT3x9.5 Screw *3
Compatibility:
X2D